• Home
  • About
    • Our Brochure
    • Careers
    • Meet The Team
    • Testimonials
    • Our Policies
  • Services
    • Interlocking Design
    • IRSE Log Book & Licensing
    • Scheme Plans
    • Signalling Reports
    • Signalling Interfaces
    • Tender Support
    • Trackside Design
  • Projects
    • Christon Bank
    • Crescent Road
    • Crystal Palace
    • Horsham Level Crossing
    • Macclesfield Resignalling
    • Perth & Haymarket
    • Radlett Rail Interchange
    • Speed Restrictions
    • Vale Sidings
  • News
    • DigiSig Rail Newsletters
  • Contact Us
  • Debs
  • 13/06/2024
  • Comments (0)

From our Survey we asked you – What are the top challenges that your business is facing right now? 🤔

From our survey results it appears that most of you are struggling with the lull of work between Network Rail’s crossover period from CP6 to CP7. Here’s a few snippets of the anonymous replies we have received: 😮

“Lack of work visibility from Network Rail between control periods.”
“Reduced work volumes & constantly waiting for CP7 to start.”
“Slow transition between control periods, which should have been smoothed out by now.”
“NWR spend coming through from CP6 to CP7 and a general lack of long-term vision.”
“Non-existent work-bank in the new Control Period.”
“Still waiting for CP7 to start which means we have low internal staff utilisation and the outsourcing & organising of potential work is impossible.”
“Getting the work bank in from being talked about, to actual deliverables within a contract.”
“Despite major contracts being awarded months ago we are still waiting for CP7 to start – this means we have reduced workloads and lower work volumes.”

What is has your experience been between Network Rail’s control period crossovers? Does it affect your business in anyway? We’d love to hear your thoughts? 🤔

Share:

Post navigation

Previous Post Previous Post
We’ve Passed Our RISQS Audit
Next Post Next Post
Reasons Why Our Customers Chose Us

Sign Up For Our Newsletter & Brochure



Accreditations

Latest News

Our Newsletter is out Now

  26/02/2025

Ben From Lanzarote to Signalling Design

  19/02/2025

Connor Hutchings My Story

  17/02/2025

Miles Wootton My Story

  11/02/2025

Copy Brochure?



Address Location

Suite 2, Wrens Court, Lower Queen Street, Sutton Coldfield B72 1RT 0333 577 4200

© Copyright 2022 | Digisig Rail Group Limited | All right reserved.