Our recent project at Crystal Palace Station made the news in Rail Business Daily today. Our team provided the signalling design deliverables required for alterations to Platform 3 at Crystal Palace Station. Why not take a peak online or read the attached pdf document.
We were responsible for production of all the Signalling Design deliverables:
Signalling Design Specification
Signalling Scheme Plan
Track Plan
Correlation Specification
Design for lineside Location CP204
And the alterations:
Disconnection and recovery of the affected cables
Replacement cabling of sufficient length reconnected to existing links
Permissive Working Risk Assessment
Design of Control Tables
Along with also providing full Signalling CRE support throughout the project life cycle, leading Risk Assessment Workshops & attending regular project meetings.