• Home
  • About
    • Our Brochure
    • Meet The Team
    • Testimonials
    • Our Policies
  • Services
    • Interlocking Design
    • IRSE Log Book & Licensing
    • Scheme Plans
    • Signalling Reports
    • Signalling Interfaces
    • Tender Support
    • Trackside Design
  • Projects
    • Christon Bank
    • Crescent Road
    • Crystal Palace
    • Horsham Level Crossing
    • Macclesfield Resignalling
    • Perth & Haymarket
    • Radlett Rail Interchange
    • Speed Restrictions
    • Vale Sidings
  • News
  • Contact Us
  • Debs
  • 03/07/2023
  • Comments (0)

Overview
After conducting a detailed review of Network Rail’s plans for England & Wales it includes two scenarios for expenditure. The first assumes that a £0.5 billion centrally managed fund is used to manage risks that emerge during CP7. The second is a ‘risk-adjusted’ plan which is supported by descoping up to £1.5 billion of renewals and other activities across Network Rail’s regions in England & Wales, if risk materialises.

The UK’s sector continues to recover from the pandemic against a backdrop of inflationary pressures, recent industrial action, as well as declines in passenger and freight train performance. The sector must also meet the challenges of climate change by contributing to a low-emissions railway and planning for severe weather events.  Spend for CP7 is £44.8 billion compared with CP6 of £42.7 billion.

Train Performance
The ORR expect no further decline in train performance and for Network Rail to deliver ambitious but deliverable improvements for passengers and freight customers. They also propose £0.04 billion is reserved for a train performance improvement and innovation fund (PIIF) in England & Wales.

Asset Performance & Sustainability
The ORR draft determination proposes a re-allocation of expenditure of £0.55 billion to increase core renewals.

Health & Safety
Network Rail’s risk-adjusted plan implies scope for at least £3.2 billion of efficiencies in England & Wales during CP7. After careful scrutiny of the plans the ORR consider this target will be stretching but deliverable.

Risk Funding
Network Rail has initially allocated £1.5 billion for its risk planning fund however, the ORR have also identified further risk funding opportunities which would mean a total of £2.0 billion going into the their Risk Fund.

Overall Funding & Meeting Requirements
The ORR believes that the overall funding should allow Network Rail to deliver its commitments across the network in CP7.  Click here to see the ORR’s report. 

#ORR #CP7 #Rail #Funding

Share:

Post navigation

Previous Post Previous Post
Rail Safety Week – RSW 2023
Next Post Next Post
New MD of Buckingham Group

Accreditations

Latest News

Our Newsletter is out Now

  26/02/2025

Ben From Lanzarote to Signalling Design

  19/02/2025

Connor Hutchings My Story

  17/02/2025

Miles Wootton My Story

  11/02/2025

Address Location

Suite 2, Wrens Court, Lower Queen Street, Sutton Coldfield B72 1RT 0333 577 4200

Website Design by Specialist Marketing Agency